(Publish from Houston Texas USA)

(Mian Iftikhar Ahmad)

Faisalabad: Managing Director WASA Sohail Qadir Cheema visited Jhang Road to inspect the proposed route for laying a new 72-inch pipeline and directed that the main Jhang Road must not be damaged at any stage during the installation work. He stated that a comprehensive and sustainable plan has been formulated to permanently resolve the longstanding sewerage issues of Saifabad and adjoining residential areas, under which a 72-inch diameter pipeline will be laid for the efficient disposal of sewage from Saifabad, and its route is being finalized. During the MD’s visit, Director Operations West Makhdoom Babar briefed him on the technical aspects of the pipeline project. Sohail Qadir Cheema emphasized that providing citizens with high-quality drainage facilities is a top priority, and new development schemes have been introduced for this purpose, which will be completed by the end of the next fiscal year. He added that once these schemes are completed, sewerage-related issues during the monsoon season will be significantly reduced.

Latest Articles

Opinion

Advertising

SouthAsianChronicle is an independent digital news platform delivering accurate, timely, and insightful journalism from South Asia and around the world.

© 2026 South Asian Chronicle Digital Network. All Rights Reserved.

Social

Email

Designed bySouthAsian Chronicle Media Team